Geez... couldn't they have made that bridge a bit wider?? Everytime I cross it on the bus I keep thinking the driver'll get his mirror ripped off. I'm glad it's moving along so quickly but I would have thought they'd have taken into consider the amount of cars that cross it every day...
The plan is to make both of the bridges one way. In case of flooding, though, the permanent bridge, which was built up higher than the previous one, would become the primary bridge again. So far the causeway has worked well.
While this was first called the temporary bridge, since the plan is to use it for one way traffic, it no longer can be called that. Thus we referred to it as a causeway. It will be in permanent use, unless it gets washed away.