Hi
I have a builder i have used before who at that time charged me
$350 per sq meter (2004)+10% maestro fee
I suspect for the same level of construction it would be at least $500 per mtr...it was easy to build this way.
I paid him and it was completed
Question
1/ For those that have built a home with a builder complete turn key like i did...is it cheaper to do it this way
versus
2/ the builder putting up all the block, roof plumbing all the basics
leaving the owner to negotiate/install the fixtures, tiles, kitchen installers windows etc
Would the savings be significant to go option 2
any thoughts????
I have a builder i have used before who at that time charged me
$350 per sq meter (2004)+10% maestro fee
I suspect for the same level of construction it would be at least $500 per mtr...it was easy to build this way.
I paid him and it was completed
Question
1/ For those that have built a home with a builder complete turn key like i did...is it cheaper to do it this way
versus
2/ the builder putting up all the block, roof plumbing all the basics
leaving the owner to negotiate/install the fixtures, tiles, kitchen installers windows etc
Would the savings be significant to go option 2
any thoughts????