Watching a build going on a half block away. They're pouring the slab on the second floor:
Each batch is:
5 gallons water
1 wheelbarrow sand
1 wheelbarrow dirt
1 bag (94lbs) mortar
No aggregate at all.
I wonder what the rebar schedule is...
This is why I want to shop very carefully for a maestro...