OK we have all seen the curb and backfill on the North side of the road along Sosua beach. Seems maybe one or two trucks a week dump their loads often spilling over the curb into the street.
Well this past week I saw a poor young man (maybe 17 years) go down hard in the road after his scooter hit a large clod from one of those loads which had spilled onto the travel way. He rolled about 3 times, and his scooter slid into him, as his helmet (which was perched on top of his head of course) bounced across the road in front of my car. The car behind him swerved to miss him and his scooter.
He got up limping badly with several nasty cuts to his bare legs and arms.
Why has it taken so long to backfill and level the dirt behind this curb. It was actually safer before, as now you cannot walk over these piles and are forced to walk outside the parked cars to get to the beach stairs. Is the mayor of Sosua so inept that this project couldn't have been completed before high season ? Punta Cana sure could do it because they want repeat tourists.
In any organized locale this project is two weeks to complete - make it 3 with a concrete sidewalk. But not here Prediction = it won't be finished before next year either.
Well this past week I saw a poor young man (maybe 17 years) go down hard in the road after his scooter hit a large clod from one of those loads which had spilled onto the travel way. He rolled about 3 times, and his scooter slid into him, as his helmet (which was perched on top of his head of course) bounced across the road in front of my car. The car behind him swerved to miss him and his scooter.
He got up limping badly with several nasty cuts to his bare legs and arms.
Why has it taken so long to backfill and level the dirt behind this curb. It was actually safer before, as now you cannot walk over these piles and are forced to walk outside the parked cars to get to the beach stairs. Is the mayor of Sosua so inept that this project couldn't have been completed before high season ? Punta Cana sure could do it because they want repeat tourists.
In any organized locale this project is two weeks to complete - make it 3 with a concrete sidewalk. But not here Prediction = it won't be finished before next year either.