Grupo Punta Cana showed their planning for PUJ 2004/2005
including:
Add 4 more stand, for total of 12 stand.
to install a Radar
expand the PUJ Terminal ( possible with gates )
a new second runway of 3,800 mts x 60 mts. ( A380 airplane )
a National Satellite
and other things.
including:
Add 4 more stand, for total of 12 stand.
to install a Radar
expand the PUJ Terminal ( possible with gates )
a new second runway of 3,800 mts x 60 mts. ( A380 airplane )
a National Satellite
and other things.