Cangrejo bridge closed due to major structural failure.

Status
Not open for further replies.

rogerjac

Bronze
Feb 9, 2012
1,396
466
83
The bridge has a base layer of asphalt on it. Are you sure they've put on the top, finish layer?
It don't matter to these guys. Base layer, top layer...all the same to them. It is paved to the top of the concrete where the expansion joints are so that's it for paving. Also no waterproofing on the bridge before asphalt either. Lucky if they sprayed on a tack coat.
 

chico bill

Dogs Better than People
May 6, 2016
12,707
6,448
113
It don't matter to these guys. Base layer, top layer...all the same to them. It is paved to the top of the concrete where the expansion joints are so that's it for paving. Also no waterproofing on the bridge before asphalt either. Lucky if they sprayed on a tack coat.
Good asphalt is the waterproofing, although they do make asphalt that free drains for environmental reasons but you won't find that in DR
 

windeguy

Platinum
Jul 10, 2004
42,459
6,128
113
I will have to break out a Chacabana:

12-20.jpg
 

JD Jones

Moderator:North Coast,Santo Domingo,SW Coast,Covid
Jan 7, 2016
12,067
8,429
113
Most of it. Skipped through one speaker to the next. Too much blah, blah, blah to listen to it all. Never saw Abinader.
He couldn't make it. I'm guessing he's worried about the weather
 
  • Like
Reactions: bachata
Status
Not open for further replies.