Elections are in July of 2024. The bridge will probably be finished shortly before that.
The Magic 8 Ball says "Not Likely".
Look at the curb work along Hwy 5 in Sosua for a look at how poorly Dominicans do planning, engineering and infrastructure.
I seriously could have taken 4 guys from my home town and completed the work by now with curbs, gutters and sidewalks that actually were on grades and drained.
Willy should fire whoever got the contract on the work, tear it all out and bring in a skilled crew. Which may be the case because I see work has stopped for two weeks?
And don't tear the ground up in front of businesses (like Germany Bar and Restaurants - then leave it for weeks unfinished. Do small parts at a time and finish it.
Absolutely better work can be found in the poorest parts of Africa than this curb work. It's not even acceptable to Haitian standards.