{"id":198676,"date":"2023-05-29T08:04:53","date_gmt":"2023-05-29T12:04:53","guid":{"rendered":"https:\/\/dr1.com\/news\/?p=198676"},"modified":"2023-05-29T09:13:40","modified_gmt":"2023-05-29T13:13:40","slug":"more-solar-farms-for-the-dr","status":"publish","type":"post","link":"https:\/\/dr1.com\/news\/2023\/05\/29\/more-solar-farms-for-the-dr\/","title":{"rendered":"More solar farms for the DR"},"content":{"rendered":"\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-large is-resized\"><img src=\"https:\/\/dr1.com\/news\/wp-content\/uploads\/2023\/05\/Comision-Nacional-Energia-CNE-nuevos-parques-energia-CNE-1024x676.png\" alt=\"\" class=\"wp-image-198746\" width=\"600\"\/><\/figure><\/div>\n\n\n\n<p>The steady pace of installation of new solar farms in the Dominican Republic continues. This past week, the National Energy Commission (CNE) authorized three new companies to install another 148MW of solar energy.<\/p>\n\n\n\n<p>The companies are:<br>LCV Ecoener Solares Dominicana \u2013 50 MWn Planta Solar Fotovoltaica Payita 1 in Nagua, Mar\u00eda Trinidad S\u00e1nchez in the northeast.<br>Cotoper\u00ed Solar FV \u2013 48.06 MWn Parque Fotovoltaico Cotoper\u00ed Solar in Guaymate, La Romana in the southeast.<br>Renewable Energy World Dominicus \u2013 50MWn Parque Solar REWD in Villa Hermosa, La Romana in the southeast.<\/p>\n\n\n\n<p>Read more in Spanish:<br><a href=\"https:\/\/www.cne.gob.do\/noticia\/cne-otorga-tres-nuevas-concesiones-definitivas-las-que-sumaran-148-megavatios-al-sistema-electrico-nacional\/\">CNE <\/a><\/p>\n\n\n\n<p>29 May 2023<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The steady pace of installation of new solar farms in the Dominican Republic continues. This past week, the National Energy Commission (CNE) authorized three new companies to install another 148MW of solar energy. The companies are:LCV Ecoener Solares Dominicana \u2013 50 MWn Planta Solar Fotovoltaica Payita 1 in Nagua, Mar\u00eda Trinidad S\u00e1nchez in the northeast.Cotoper\u00ed &hellip; <\/p>\n<p class=\"link-more\"><a href=\"https:\/\/dr1.com\/news\/2023\/05\/29\/more-solar-farms-for-the-dr\/\" class=\"more-link\">Read more\u2026<\/a><\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[319,3],"tags":[],"_links":{"self":[{"href":"https:\/\/dr1.com\/news\/wp-json\/wp\/v2\/posts\/198676"}],"collection":[{"href":"https:\/\/dr1.com\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/dr1.com\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/dr1.com\/news\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/dr1.com\/news\/wp-json\/wp\/v2\/comments?post=198676"}],"version-history":[{"count":2,"href":"https:\/\/dr1.com\/news\/wp-json\/wp\/v2\/posts\/198676\/revisions"}],"predecessor-version":[{"id":198748,"href":"https:\/\/dr1.com\/news\/wp-json\/wp\/v2\/posts\/198676\/revisions\/198748"}],"wp:attachment":[{"href":"https:\/\/dr1.com\/news\/wp-json\/wp\/v2\/media?parent=198676"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/dr1.com\/news\/wp-json\/wp\/v2\/categories?post=198676"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/dr1.com\/news\/wp-json\/wp\/v2\/tags?post=198676"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}