{"id":240304,"date":"2025-08-18T06:53:59","date_gmt":"2025-08-18T10:53:59","guid":{"rendered":"https:\/\/dr1.com\/news\/?p=240304"},"modified":"2025-08-18T09:08:55","modified_gmt":"2025-08-18T13:08:55","slug":"metro-line-2-reaches-los-alcarrizos-on-test-run","status":"publish","type":"post","link":"https:\/\/dr1.com\/news\/2025\/08\/18\/metro-line-2-reaches-los-alcarrizos-on-test-run\/","title":{"rendered":"Metro Line 2 reaches Los Alcarrizos on test run"},"content":{"rendered":"\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-large is-resized\"><img src=\"https:\/\/dr1.com\/news\/wp-content\/uploads\/2025\/08\/Metro-Santo-Domingo-Los-Alcarrizos-Presidencia-1024x573.png\" alt=\"\" class=\"wp-image-240370\" width=\"600\" srcset=\"https:\/\/dr1.com\/news\/wp-content\/uploads\/2025\/08\/Metro-Santo-Domingo-Los-Alcarrizos-Presidencia-1024x573.png 1024w, https:\/\/dr1.com\/news\/wp-content\/uploads\/2025\/08\/Metro-Santo-Domingo-Los-Alcarrizos-Presidencia-300x168.png 300w, https:\/\/dr1.com\/news\/wp-content\/uploads\/2025\/08\/Metro-Santo-Domingo-Los-Alcarrizos-Presidencia-768x430.png 768w, https:\/\/dr1.com\/news\/wp-content\/uploads\/2025\/08\/Metro-Santo-Domingo-Los-Alcarrizos-Presidencia-1536x860.png 1536w, https:\/\/dr1.com\/news\/wp-content\/uploads\/2025\/08\/Metro-Santo-Domingo-Los-Alcarrizos-Presidencia-2048x1146.png 2048w\" sizes=\"(max-width: 706px) 89vw, (max-width: 767px) 82vw, 740px\" \/><\/figure><\/div>\n\n\n\n<p>The Santo Domingo Metro Office (Opret) announces successful test rides for the Metrro Line 2 that reaches Los Alcarrizos.<\/p>\n\n\n\n<p>President Luis Abinader has said he will ride the Metro Line 2 on its test run in September 2025. The extension of the mass transit service to Los Alcarrizos, the most populated bed city of the National District, is expected to be available to the general public as of February 2026. The line has been built during the Abinader administration.<\/p>\n\n\n\n<p>Read more in Spanish:<br><a href=\"https:\/\/presidencia.gob.do\/noticias\/metro-de-santo-domingo-llega-por-primera-vez-los-alcarrizos-en-prueba-dinamica\">Presidency <\/a><\/p>\n\n\n\n<p>18 August 2025<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Santo Domingo Metro Office (Opret) announces successful test rides for the Metrro Line 2 that reaches Los Alcarrizos. President Luis Abinader has said he will ride the Metro Line 2 on its test run in September 2025. The extension of the mass transit service to Los Alcarrizos, the most populated bed city of the &hellip; <\/p>\n<p class=\"link-more\"><a href=\"https:\/\/dr1.com\/news\/2025\/08\/18\/metro-line-2-reaches-los-alcarrizos-on-test-run\/\" class=\"more-link\">Read more\u2026<\/a><\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[337,3],"tags":[],"_links":{"self":[{"href":"https:\/\/dr1.com\/news\/wp-json\/wp\/v2\/posts\/240304"}],"collection":[{"href":"https:\/\/dr1.com\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/dr1.com\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/dr1.com\/news\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/dr1.com\/news\/wp-json\/wp\/v2\/comments?post=240304"}],"version-history":[{"count":3,"href":"https:\/\/dr1.com\/news\/wp-json\/wp\/v2\/posts\/240304\/revisions"}],"predecessor-version":[{"id":240372,"href":"https:\/\/dr1.com\/news\/wp-json\/wp\/v2\/posts\/240304\/revisions\/240372"}],"wp:attachment":[{"href":"https:\/\/dr1.com\/news\/wp-json\/wp\/v2\/media?parent=240304"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/dr1.com\/news\/wp-json\/wp\/v2\/categories?post=240304"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/dr1.com\/news\/wp-json\/wp\/v2\/tags?post=240304"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}