{"id":248158,"date":"2026-03-03T08:19:09","date_gmt":"2026-03-03T12:19:09","guid":{"rendered":"https:\/\/dr1.com\/news\/?p=248158"},"modified":"2026-03-03T09:57:23","modified_gmt":"2026-03-03T13:57:23","slug":"dominican-authorities-agree-to-launch-initiative-to-strip-obsolete-cabling-from-national-district-streets","status":"publish","type":"post","link":"https:\/\/dr1.com\/news\/2026\/03\/03\/dominican-authorities-agree-to-launch-initiative-to-strip-obsolete-cabling-from-national-district-streets\/","title":{"rendered":"Dominican authorities agree to launch initiative to strip obsolete cabling from National District streets"},"content":{"rendered":"\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-full\"><img loading=\"lazy\" width=\"600\" height=\"338\" src=\"https:\/\/dr1.com\/news\/wp-content\/uploads\/2026\/03\/Retiro-cableado-en-esuso-en-DN-Diario-Libre.png\" alt=\"\" class=\"wp-image-248188\" srcset=\"https:\/\/dr1.com\/news\/wp-content\/uploads\/2026\/03\/Retiro-cableado-en-esuso-en-DN-Diario-Libre.png 600w, https:\/\/dr1.com\/news\/wp-content\/uploads\/2026\/03\/Retiro-cableado-en-esuso-en-DN-Diario-Libre-300x169.png 300w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><\/figure><\/div>\n\n\n\n<p>In a coordinated effort to improve public safety and urban aesthetics, the Dominican Telecommunications Institute (Indotel), the Mayor\u2019s Office of the National District (ADN), and the Unified Council of Electricity Distribution Companies (CUED) signed a strategic cooperation agreement on Thursday, 26 February 2026, to remove obsolete and unused aerial cabling across the capital, as reported in Diario Libre.<\/p>\n\n\n\n<p>The agreement was formalized by Guido G\u00f3mez Mazara, president of Indotel; Celso Marranzini, president of the CUED; and Carolina Mej\u00eda, Mayor of the National District. The initiative targets the &#8220;visual pollution&#8221; caused by tangled wires and aims to mitigate physical risks to pedestrians and drivers caused by deteriorating infrastructure.<\/p>\n\n\n\n<p>In recent years, residents of Santo Domingo have frequently reported &#8220;spaghetti&#8221; wiring falling into streets, posing electrocution hazards and obstructing sidewalks.<\/p>\n\n\n\n<p>Strategic execution and priority zones<br>The project is set to impact over 300 kilometers of cabling, spanning both high-traffic commercial corridors and residential neighborhoods. The removal will be carried out in stages, prioritizing the following areas:<br>\u2022 The Ciudad Colonial and San Carlos<br>\u2022 The Pol\u00edgono Central (including Naco, Piantini, and Bella Vista)<br>\u2022 Populous sectors such as Cristo Rey and Los Girasoles<\/p>\n\n\n\n<p>Guido G\u00f3mez Mazara described the pact as a &#8220;turning point&#8221; for the city, moving from years of planning into a concrete execution phase. &#8220;Removing obsolete cabling is not just an aesthetic choice; it is a direct responsibility toward citizen safety and urban mobility,&#8221; Gomez Mazara stated during the signing at the CUED headquarters.<\/p>\n\n\n\n<p>Institutional roles<br>Each entity has been assigned specific mandates to ensure the project&#8217;s success:<br>\u2022 Indotel: Will serve as the regulatory lead, coordinating with telecommunications providers to ensure networks are organized without interrupting essential services.<br>\u2022 ADN (Mayor\u2019s Office): Responsible for field supervision, logistics, and the final cleaning of intervened areas to ensure the public space is fully recovered.<br>\u2022 CUED: Will provide technical support to distinguish between telecommunications wires and active electrical lines, ensuring the safety of workers during the removal process. The CUED oversees the country&#8217;s three main distributors: Edeeste, Edenorte, and Edesur.<\/p>\n\n\n\n<p>Mayor Carolina Mej\u00eda emphasized that the cleanup is a priority for the wellbeing of the capital&#8217;s inhabitants.<\/p>\n\n\n\n<p>Read more in Spanish:<br><a href=\"https:\/\/www.diariolibre.com\/actualidad\/ciudad\/2026\/02\/26\/retiraran-y-reduciran-cableados-en-el-distrito-nacional\/3450281\">Diario Libre <\/a><\/p>\n\n\n\n<p>3 March 2026<\/p>\n","protected":false},"excerpt":{"rendered":"<p>In a coordinated effort to improve public safety and urban aesthetics, the Dominican Telecommunications Institute (Indotel), the Mayor\u2019s Office of the National District (ADN), and the Unified Council of Electricity Distribution Companies (CUED) signed a strategic cooperation agreement on Thursday, 26 February 2026, to remove obsolete and unused aerial cabling across the capital, as reported &hellip; <\/p>\n<p class=\"link-more\"><a href=\"https:\/\/dr1.com\/news\/2026\/03\/03\/dominican-authorities-agree-to-launch-initiative-to-strip-obsolete-cabling-from-national-district-streets\/\" class=\"more-link\">Read more\u2026<\/a><\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[340,3],"tags":[],"_links":{"self":[{"href":"https:\/\/dr1.com\/news\/wp-json\/wp\/v2\/posts\/248158"}],"collection":[{"href":"https:\/\/dr1.com\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/dr1.com\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/dr1.com\/news\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/dr1.com\/news\/wp-json\/wp\/v2\/comments?post=248158"}],"version-history":[{"count":2,"href":"https:\/\/dr1.com\/news\/wp-json\/wp\/v2\/posts\/248158\/revisions"}],"predecessor-version":[{"id":248189,"href":"https:\/\/dr1.com\/news\/wp-json\/wp\/v2\/posts\/248158\/revisions\/248189"}],"wp:attachment":[{"href":"https:\/\/dr1.com\/news\/wp-json\/wp\/v2\/media?parent=248158"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/dr1.com\/news\/wp-json\/wp\/v2\/categories?post=248158"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/dr1.com\/news\/wp-json\/wp\/v2\/tags?post=248158"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}