{"id":73452,"date":"2016-04-27T10:30:20","date_gmt":"2016-04-27T10:30:20","guid":{"rendered":"http:\/\/dr1.com\/new\/?p=73452"},"modified":"2016-04-27T10:30:20","modified_gmt":"2016-04-27T10:30:20","slug":"solar-power-plant-at-carrefour-santo-domingo","status":"publish","type":"post","link":"https:\/\/dr1.com\/news\/2016\/04\/27\/solar-power-plant-at-carrefour-santo-domingo\/","title":{"rendered":"Solar power plant at Carrefour Santo Domingo"},"content":{"rendered":"<p> The Santo Domingo branch of French hypermarket chain Carrefour has inaugurated a rooftop solar energy plant that cost more than US$2 million. The panels will supply much of the store&#8217;s energy needs. Carrefour general director Olivier Pellin said the system was installed by Solar Electric and has 4,744 panels with a 1.25 MW generation capacity on the 14,000-square meter roof of the building at Km 10.5 of Duarte Highway. Pellin said it was the largest solar roof in the country and described it as Carrefour&#8217;s contribution to the environment. He said the company has changed all its lighting to Led and installed high efficiency air-conditioning. Solar Electric general manager David Doumith estimated that Carrefour would now make savings of 30% on its power bill. According to estimates, Carrefour will recoup its investment in seven years, with a 25-year lifespan for the plant. <\/p>\n<p> Jean Alain Rodriguez of the Center for Export and Investment (CEI-RD) represented the Dominican government at the event. <\/p>\n<p> http:\/\/www.7dias.com.do\/economia\/2016\/04\/26\/i209561_carrefour-instala-planta-solar-megavatios-costo-millones.html<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Santo Domingo branch of French hypermarket chain Carrefour has inaugurated a rooftop solar energy plant that cost more than US$2 million. The panels will supply much of the store&#8217;s energy needs. Carrefour general director Olivier Pellin said the system was installed by Solar Electric and has 4,744 panels with a 1.25 MW generation capacity &hellip; <\/p>\n<p class=\"link-more\"><a href=\"https:\/\/dr1.com\/news\/2016\/04\/27\/solar-power-plant-at-carrefour-santo-domingo\/\" class=\"more-link\">Read more\u2026<\/a><\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[4,3],"tags":[],"_links":{"self":[{"href":"https:\/\/dr1.com\/news\/wp-json\/wp\/v2\/posts\/73452"}],"collection":[{"href":"https:\/\/dr1.com\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/dr1.com\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/dr1.com\/news\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/dr1.com\/news\/wp-json\/wp\/v2\/comments?post=73452"}],"version-history":[{"count":0,"href":"https:\/\/dr1.com\/news\/wp-json\/wp\/v2\/posts\/73452\/revisions"}],"wp:attachment":[{"href":"https:\/\/dr1.com\/news\/wp-json\/wp\/v2\/media?parent=73452"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/dr1.com\/news\/wp-json\/wp\/v2\/categories?post=73452"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/dr1.com\/news\/wp-json\/wp\/v2\/tags?post=73452"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}