Someone once asked for pictures, here's the link to the system and production stats....:laugh:
https://enlighten.enphaseenergy.com/pv/public_systems/HDAt149204
Went into full production on March 13, 2013 when EDESUR installed the Bi-directional meter.
The dual axis function goes active as soon as I can install the components....hopefully by monthes end!!!
My compliments to the CNE (Comision Nacional de Eneregia) the for the Exoneration of the imported items and subsequent Certification of the equipment for inclusion into the Net metering program and EDESUR for the effortless application process and the damn quick service to install the Bi-directional meter.
Application turned in on March 8, on morning of March 13, meter change over is done and the solar switch was turned on, first day production was 33 Kwh!!!!!
Thank You
https://enlighten.enphaseenergy.com/pv/public_systems/HDAt149204
Went into full production on March 13, 2013 when EDESUR installed the Bi-directional meter.
The dual axis function goes active as soon as I can install the components....hopefully by monthes end!!!
My compliments to the CNE (Comision Nacional de Eneregia) the for the Exoneration of the imported items and subsequent Certification of the equipment for inclusion into the Net metering program and EDESUR for the effortless application process and the damn quick service to install the Bi-directional meter.
Application turned in on March 8, on morning of March 13, meter change over is done and the solar switch was turned on, first day production was 33 Kwh!!!!!
Thank You