John Modesto, vice president of Grupo Modesto announces that the permanent bridge over Chavon River will be in operation by 15 November. The bridge has cost RD$71 million and was built higher than the previous structure so that it would not be vulnerable to a collapse, as happened following the surge of waters caused by Hurricane Jeanne in September. A temporary causeway has been in place since October.