"The current sewers jutting out of the malec?n will be eliminated." Nals
How and where to? Would you post the entire plan for us ignorant locals who only seem to have access through the local press and our eyes_
Annie we don't need to worry about it!
i see that Nals has taken his I'm full of crap pills this morning. The rats nest of wires on the poles may be a work in progress, but I'm not going to live long enough to see it completed. not sure my grand children will. because its not just the zona its all over the city! Hell I'm still waiting for the electricity fix that Balaguer promised.
Malecon restoration, park across the malecon from Eugenio Mar?a de Hostos park has been walled off for 2 years and looking past the fence there is nothing being done.
Sewage pipes, good luck with this one, from the Nepolitano to Lincoln ave they all leak. The other park area they are redoing around Gomez, were the little beach was. that was ok as long as you could dodge the toilet paper.(hum what happened to the artificial Island?)
They can't widen the Malecon as there is not enough room between the hotels and the water to include a median, an a parking lane(s) and maintain the current number of transit lanes, that get compressed to 1 each way on Friday, Saturday, and Sunday nights due to the parking on both sides of the street. which by the way is the worst impediment to transiting the city on any of the major thruways, these should all have parking banned!
according to the drivers manual
En medio de una intersedccion que esta prohibido "Estacionar o reparar un vehiculo" Common sense tells you this should not be done, here its in the manual del conductor. or then there is the one about not parking on the sidewalk.
I don't know if the glasses that Nals has are the rose colored ones or just beer goggles. Maybe just too much time in Connecticut.