In the DR is this what they call The 500 foot club?
360 degrees views from teleferico santo domingo:
https://www.diariolibre.com/noticias/un-recorrido-virtual-por-el-teleferico-KA9266783
looks great.
They actually built the thing? what are entry/exit points Sorry, don't understand spanish
I did not know it was overhead cars. Ugly as hell but it would work better than street level cars. They better maintain them....hate to see them dropping from the sky.
Fantastic. My only concern is weight capacity. These are not
conchos. They are going to have to educate people otherwise
what goes up (loaded with the heavies) may come crashing down.
History here of lack of maintenance from Airplanes, Boats/ferries, commercial trucks , buildings and such are a pre-warning of a disaster in the making. And I am a positive thinker.!!! I would never do the cable car in Puerto Plata.
There is a mindset here ''if it breaks, fix it; if it is not broken don't maintain it''. Compliance to Law needs inspections and ''Stop operations Orders''.... I bought a new condo here in Luperon which as it turned out was built to ''cost cutting rules'' not RD building codes, But we were inspected and someone made a fist full of dollars ... my unit collapsed after heavy rains. Which undermined a much too narrow footing resting upon clay. That is a mindset and it will be virtually imposible to change.
Fantastic. My only concern is weight capacity. These are not
conchos. They are going to have to educate people otherwise
what goes up (loaded with the heavies) may come crashing down.
They actually built the thing? what are entry/exit points Sorry, don't understand spanish
They actually built the thing? what are entry/exit points Sorry, don't understand spanish
it's a multiple entry/exit system, think of it as metro but overground. crosses a large part of the city.
A couple weeks ago i was at the Metro L2 Eduardo Brito Station and saw some construction work going on. My first thought was they were back to working on the completion of the Metro L2 expansion. My current thought is it must have been work prepping for the opening of the Teleferico SD.
Now if they can only finish Metro L2, so far two years and waiting..............
Not sure about this, what has it been... 5 years plus and the Metro is still up and running with from what my eyes can see has been well maintained
Great, is this designed as a mass transport or attraction?
Regarding?
Whether it was built or not.
Sorry, I sometimes fail to realize many folks here don't read daily news outlets.
If you are looking at usage, the metro is a smashing success, and the next line will be more successful because it will connect east SD to west.
There are plans to add additional cars.
The Telesferico will be maxed out from the moment it starts, and I would bet even money there's another one coming right behind it.